top of page

138 KV Inspections

In 2015 we performed detailed 138 KV line assessments for Yukon Energy Corporation. Our crews travelled rough terrain with side by sides to access the structures along the right of way.

In 2015 we performed detailed 138 KV line assessments for Yukon Energy Corporation. Our crews travelled rough terrain with side by sides to access the structures along the right of way.
bottom of page